Competition in the tin packaging industry is
very tight so that every industry must improve the
effectiveness of the machine in order to survive,
compete and dominate the market. The purpose of this
study is to calculate the level of effectiveness of the
engine, the factors causing low effectiveness, the root of
the problems encountered and the settlement related to
the treatment machine in the packaging industry cans.
The approach used to solve the problems is Total
Productive Maintenance. Total Productive Maintenance
is one of the elements of manufacturing aimed at
improving the effectiveness of the machine. The main
indicator is the Overall Equipment Effectiveness TPM.
OEE calculation results in this study was 65.43%. Six
Analysis of the dominant big losses by using Pareto
diagram is setup and adjustment losses amounted to 62,
84% and reduced speed losses amounted to 29.18%. To
find the root problems using techniques 5 way and
further illustrated by the cause and effect diagram. The
problem faced by the industry is a factor
kemasankaleng machine maintenance. Implementation
of Focused Improvement and Autonomous
Maintenance is expected to resolve the problem and
improve efektivitasmesin.
Keywords : Total Productive Maintenance, Overall Equipment Effectiveness, Six Big Losses, Cause and Effect Diagram, Autonomous Maintenance, Focused Improvement.