PT. Tri Tunggal Laksana is an industry that
focusing on wood processing. During the production
period, the tools have a high frequency of trouble. Total
Productive Maintenance (TPM) has been recognized as
one of the significant operation strategy to regain the
production losses due to equipment inefficiency. Many
organizations have implemented TPM to improve their
equipment efficiency and to obtain the competitive
advantage in the global market in terms of cost and
quality. In the implementation of TPM in a
manufacturing organization, both Human-oriented and
Process-oriented strategy has been identified as critical
success factors. Based on the problem background, the
research do because Rotary Machine 5 Feet having so
many trouble in July to December of 2019 during the
production period. After the research is done, the
average of OEE calculation is equal to 56.29%. It can be
concluded that the effectiveness of the machine is still
far from world class standard that is equal to 85%. Six
big losses factors that contribute most to Rotary
Machine effectiveness is Reduce Speed Losses that is
22,31%. According to the fishbone diagram analysis
factors that causing the OEE is low can be identified so
that improvement can be done immediately.
Keywords : Fishbone Diagram, Overall Equipment Effectiveness, Six Big Losses, Total Productive Maintenance.