The trend of cost overrun in highway
projects is one of the major challenge faced by the
government since time immemorial. There has been
many factors which results in providing a positive as
well as negative impact to this phenomenon. The
purpose of this paper is to determine the causal causes
of cost escalation of highway projects in Kerala and in
turn develop Regression models and neural network
models for analysis of cost overrun for the future
projects.
Keywords : Cost overrun, Regression, Artificial Neural Network (ANN)