PT. Bumimulia Indah Lestari is a
manufacturing company that produces plastic packaging
using injection molding machines. The problem faced by
the company is the high downtime of the JSW J450AD
machine. during the early semester of 2020, the total
downtime of the machine was 18,060 hours. From these
problems, the author tries to measure machine
performance using the Overall Equipment Effectiveness
method. OEE measurement results show an average of
72.35%. Based on the Pareto diagram analysis, the
biggest causes of the low OEE number are reduced speed
losses by 14%. After an analysis using FMEA, it was
found that mold overheating was the biggest cause of
failure with RPN 448. The recommendation for
improvement given was to carry out routine inspections
of the cooling system such as checking the condition of
the hose, compressor chiller air pressure, and the
condition of the nozzle.
Keywords : Injection Molding, Downtime, OEE, Reduced Speed Losses, Equipment Failure Losses, FMEA, Improvement.