There is increasing requirement to integrate
a substation automation system (SAS) which provides
high performance and flexibility. IEC 61850 is upshot of
the hard work of IEC Technical Committee to fabricate
a open standard for SAS. IEC 61850 has gained
recognition in a very short span of time and is
spreading throughout the world. Substations are getting
increasingly dependent on IEDs / relays compatible
with IEC 61850 standard. However, the compliance of a
device with the standard does not guarantee
interoperability with devices from different substation
automation equipment vendors. Employing IEC 61850
compatible devices present a test to several system
integrators, due to deficiency of knowledge, skills &
expertise of Logical Nodes (LNs), Reporting (RCB),
Generic Object Oriented Substation Event (GOOSE),
Sample Measured Values (SMV) and system
redundancy. To ease a smooth implementation, all the
features and data exchanges between devices must be
evaluated & validated to ensure that the system
functions correctly. It is vital to establish the
compatibility of the devices & products furnished by
diverse manufacturers so as to establish a fruitful SAS.
Keywords : Protocol, Substation Automation, Relays, IEC 61850, LNs, GOOSE Message, Redundancy, IEDs, Inter- operability.